Skip links

Final Reductions on the up to $60 - Off Sale

Draining / Drip Collection System

After the component is removed from the epoxy bath, excess coating needs to drain back into a controlled collection area.

  • Dedicated drip zone 
  • Sloped collection tray 
  • Return-to-tank drainage 
  • Removable drip trays 
  • Product rotation 
  • Controlled withdrawal 
  • Recovery tank 
  • Reduced coating waste
  • Cleaner production area
  • Improved coating utilization
  • Reduced floor contamination
  • Easier cleaning
Product Enquiry